Quality Policy

ORDER CONTROL
How we will serve your orders:
Workshop

Step1 : Inform us what you want, can be a drawing, sample, photo, draft, or just a proposal;
Step2 : Our R&D team will work on your request and provide product drawing to you for confirm;
Step3 : After drawing confirmed, we will develop the product in our factory for you;
Step4 : When we confirm the sample and order released, we will immediately make production plan;
Step5 : Our staff will full procedure control the fabrication;
Step6 : Before delivery, we will prepare all necessary documents, book and control the shipment;
Step7 : We will work together with forwarder and make sure products will arrive your port in good condition and on time;
Step8 : We will provide you all necessary documents and help you finish clearance on time;
Step9 : In guarantee period we will take responsibility of all our products, and highly evaluate all your feedback;
Step10 : If there’s any improvement required from you or your client, we will immediately work on your request;

QA PROCESS
How we control the quality of your orders:
Workshop

Step1 : Before start mass production, we will again check the quality of design though our testing system with our QC department and R&D department;
Step2 : All materials for your orders are in detail, we will check the quality of all incoming material for your order;
Step3 : During fabrication, our QC will full procedure check the quality of your products based on our quality standards and your requirements;
Step4 : We have two outgoing products quality inspection procedure, one in factory during packing, one in warehouse before dispatch to you, double safety for your products;
Step5 : After products delivered, if there’s any quality issue happened, our QC team will immediately fly to your market and help you solve this issue, also we will bare all reasonable lost which you suffered due to quality issue of our products;

QC inspection :
1 . QC team is inspecting incoming material;
2 . InPut Process Quality Control;
3 . Quality inspection before packing;

TESTING
Light Distribution Test:

GB/T 24824 CIE 127
GB7000.1 IEC60598-1
UL1598 UL8750
IES LM-79

Mechical Strength Test:

GB/T 20138  IEC62262
GB7000.1  IEC60598-1
UL1598 UL8750

Dust Test

GB7000.1 IEC60598-1
GB4208 IEC60529
UL1598 UL8750

Photochromic Test:

GB/T 24824 CIE 127
GB7000.1 IEC60598-1
UL1598 UL8750
IES LM-79

Electrical Magnetic Interferencee Test:

GB17743 EN55015
GB17625.1 IEC61000-3-2
GB7000.1 IEC60598-1
UL1598 UL8750

Waterproof Test:

GB7000.1 IEC60598-1
GB4208 IEC60529
UL1598 UL8750

Safety Test:

GB7000.1 IEC60598-1
UL1598 UL8750

Temperature and Humid Test:

GB/T2423.1 IEC60068-2-1
GB/T2423.2 IEC60068-2-2
GB7000.1 IEC60598-1
UL1598 UL8750

Heating Test:

GB7000.1 IEC60598-1
UL1598 UL8750

Salt Spray Test:

GB/T2423.18 IEC 68-2-52
GB7000.1 IEC60598-1
UL1598 UL8750

Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop
Workshop